
Grading that sends the water the right way
Yards, lots and pads leveled and sloped so rain runs away from the house, packed firm and ready for what gets built on top.
Signs you need grading
- 01Water pools against the house or the garage after rain
- 02The yard slopes toward the house instead of away from it
- 03A lot is too uneven to build a patio, shed or ADU on
- 04Mud runs onto the driveway or the neighbor’s yard in storms
- 05New landscaping or turf needs a smooth, level base
- 06A hillside lot needs a flat area cut into it
Rough grading and fine grading
Grading is shaping the ground to a set height and slope. It comes in two passes:
Rough grading moves the bulk of the dirt: cutting high spots, filling low ones, cutting a pad into a slope or bringing a lot up to height. This is machine work with the track loader and the mini excavator.
Fine grading sets the final surface within an inch or so of where it needs to be, so a patio base, sod, turf or concrete forms sit right. This is slower, closer work.
Between the two, the ground is packed. Loose fill settles over time, so it is laid in layers, watered and compacted. The photo at the top of this page shows a pad being shaped with a sprinkler keeping the soil damp, which helps it pack and keeps the dust down.
Getting water away from the house
Most grading jobs start with water. When the ground slopes toward a house, rain soaks in next to the foundation, runs under doors and collects in low spots. Setting the slope so water runs away from the walls, toward a swale, a drain or the street, fixes most of it.
Bare dirt on a slope washes out fast in a winter storm. Grading done in the dry months, with the slopes planted, covered or drained before the rain, holds up best.
Grading permits in Ventura County
Moving enough dirt needs a permit. Ventura County’s guidelines for homeowners say a grading permit from the Public Works Agency is needed when earth moving goes over 50 cubic yards, or a cut or fill is deeper than 3 feet, and a soils report may also be required (Ventura County guidelines).
The county’s grading plan checklist says a registered civil engineer must prepare the plan when the cut or fill goes over 500 cubic yards, or when drainage structures or geologic issues are involved (Ventura County grading plan checklist). Inside a city, the city’s public works or building department sets its own rules.
We tell you up front if a job looks like it crosses those lines, so the permit is in place before the machine shows up. Before any cut, 811 gets called so buried lines are marked (DigAlert).
How a grading job runs
Walk the ground
We look at the slope, where water goes now and where it needs to go.
811 and any permit
Utility lines are marked, and a grading permit is in hand if the job needs one.
Cut, fill and pack
High spots come down, low spots fill in layers, and the ground is watered and compacted.
Final slope and cleanup
The surface is set to its final height and slope, and extra dirt leaves with us.
What decides the price of grading
Grading is priced on how much dirt moves, how exact the finish has to be and whether dirt is hauled in or out.
| What it depends on | Why it matters |
|---|---|
| Size of the area | Square footage and how far the ground is from level. |
| Dirt in or out | Hauling extra dirt away, or bringing fill in, adds loads. |
| Finish | Fine grading for a patio or slab takes more care than a rough lot. |
| Soil and compaction | Clay and fill that need packing in layers take longer. |
| Permits | Larger jobs may need a grading permit or an engineer’s plan. |



Grading questions
Not sure what your job needs? Call or text photos any hour and we will tell you.
Call (805) 794-2842How do I know if my yard needs grading?
If water pools by the house, runs under doors, or the yard slopes toward the foundation, it likely does. So does any lot that needs to be level for a patio, shed or slab.
Do I need a grading permit in Ventura County?
For unincorporated areas, the county’s guidelines say yes when earth moving goes over 50 cubic yards or a cut or fill goes deeper than 3 feet. Cities set their own limits.
Can you grade a lot for an ADU or shed?
Yes. We cut and level the pad and pack it. The building plans set the final height and any soils testing.
Do you haul away extra dirt?
Yes. Dirt that comes off a grading job is loaded and hauled, or moved to where you want it on the property.
When is the best time of year to grade?
The dry months, so slopes can be planted, covered or drained before the winter rain.
Often done together
We offer grading across Ventura and Santa Barbara County. Nico's Hauling ASAP home
Towns: Ventura · Oxnard · Camarillo · Thousand Oaks · Simi Valley · Moorpark · Santa Paula · Fillmore · Ojai · Oak View · Port Hueneme · Santa Barbara · Goleta · Carpinteria

Get a free estimate on grading.
Photos help. Text them to the same number for a faster estimate.
Request a free estimate
We get back to you to set up your free estimate.
Request sent
We’ll get back to you with a time to come out.
Need us sooner? Call or text (805) 794-2842.
